星空传媒91传媒制片厂|明星换脸五级片|麻豆传媒映画女演员王茜|麻豆在传媒在线|九九国产|91制片厂在线观看一二区|夜夜草视频|四虎影院在线播放|国产精品亚洲国际在线看|大象传媒国产第一页,麻豆映画传媒有免费的吗,91制片厂安卓,亚洲成年人精选,91你懂得国产,爱豆视传媒短视频免费,免费一级片

Page Options
>> >>view
Shenzhen-Zhongshan Link construction comes to final stage
2024-04-18

1.jpg


On April 16, the entire Shenzhen-Zhongshan Link was fully covered by the 5G network, according to the project authorities.


A ceremony was held simultaneously at the west and the east artificial islands to celebrate this important moment.


3.jpg


There are also communication facilities on the bridge floor, as well as on the west and east artificial islands. The entire line has a total of 73 base stations.


4.jpg


Furthermore, the Link also began the bridge loading test on April 13. A maximum of 136 trucks (weighing about 5,000 tons) will be driven through the Zhongshan Bridge, Lingdingyang Bridge, and other non-navigable approach bridges.


5.png


Currently, the project is in the final stages towards its opening in June, with the construction of electromechanical facilities, traffic safety systems, road surface, and landscaping still in progress.


Stretching 24 kilometers, the Shenzhen-Zhongshan Link consists of one undersea tunnel, two bridges, and two artificial islands. This makes it one of the most challenging cross-sea cluster projects in the world.


Upon completion, the travel time from Shenzhen to Zhongshan will be reduced from the current two hours to less than 30 minutes.

Close】 【Print
ICP?Registration?Number:?粵ICP備?11005604號(hào)
Police?Registration?Number:?44200002442868
Website?ID:?4420000052
Sponsored?by:??Office?of?Zhongshan?Municipal?People's?Government
Technical?Support:???Information?Center?of?Zhongshan
Without?written?authorization?from??Zhongshan?Municipal?People’s?Government,?the?content?of?the?site?shall?not?be?republished?or?used?in?any?form.
About Us | Site Map| Privacy Statement| Contact us